Foundation Engineering Insights
Guides, updates, and industry knowledge from the FoundationPE team.

By Joshua Miller, PE
What's Included in a Foundation Engineering Package (And Why It Matters for Your Permit)
If you've never ordered a foundation engineering package before, the process can feel opaque. Here's what a complete, permit-ready package includes — and why each piece matters.

By Joshua Miller, PE
Metal Building Foundation Engineering: Why Your Manufacturer Doesn't Include It (And What to Do About It)
If you've ever ordered a pre-engineered metal building, you've probably noticed something missing from the package: the foundation. Here's why — and what you can do about it.

By Joshua Miller, PE
How Long Does It Take to Get a Foundation Engineering Package?
With a traditional firm, 2–4 weeks. With FoundationPE, most projects are completed in days. Here's why the difference exists.

By Joshua Miller, PE
IBC 2024 Updates: What Metal Building Contractors Need to Know About Foundation Design
IBC 2024 is now the governing code in most U.S. jurisdictions. Here's what changed and why it matters for your foundation plans.

By Joshua Miller, PE
Do I Need a Soils Report for My Metal Building Foundation?
The short answer is no — we can design without one. But understanding when a soils report helps can save you money and prevent problems.