From 4-Week Wait to 3-Day Turnaround: How a Texas Contractor Cut Foundation Delays by 85%
A metal building contractor in East Texas was losing 3–4 weeks on every project waiting for foundation engineering.

Project Details
The Challenge
The contractor was scheduling metal building installations across multiple counties. Every project required a separately engineered foundation, and every local engineer had different pricing, different timelines, and different levels of responsiveness. The building would arrive before the foundation plans were ready. Clients were frustrated. The schedule was unpredictable.
The Solution
The contractor submitted the manufacturer’s reaction tables and anchor bolt plans through FoundationPE’s online portal. The package went through four layers of review and was delivered as a complete, permit-ready PDF package within 3 days.
Results at a Glance
The Result
Foundation plans now arrive before the building does. 14 projects completed with zero permit rejections. Average cost savings of $1,500–$3,000 per project vs. previous local engineer. Project scheduling improved across the board.
“We were waiting 3–4 weeks every time we needed a foundation stamped. First project with FoundationPE came back in 3 days. That alone changed how we schedule jobs.”
Mike R.
Metal Building Contractor (TX)